DART - TRE Madill Bridge Slope Failure

Owner
Dallas Area Rapid Transit Authority
Completed

October-19

Location

DART - TRE Madill Bridge Slope Failure

Excavate and secure the area for drilling, remove DS spoils, deliver H-piles to driller, plumb and brace H-pile, furnish and install concrete or pea gravel backfill for piers, installation of waler system, backfilling of excavation and installation of 12" of sub-ballast.