Westside III Water Transmission Main
Owner
Completed
January 2024
Location
Westside III Water Transmission Main
The Westside III 24-inch diameter water transmission main will be constructed perpendicular to the proposed Westside III 42-inch diameter water transmission main that will extend from the Westside Water Treatment Plant on Old Weatherford Road to just south of I-20. The majority of the Westside III 24-inch diameter water transmission main is in Fort Worth’s extra territorial jurisdiction, southeast of Fort Worth Council District 3 and west of the city of Benbrook.
The major work will consist of the (approximate) following:
9,468 LF of 24. water transmission main by open cut.
50 LF of 24. water transmission main in 42. steel casing pipe by open cut.
155 LF of 24. water transmission main in 42. steel casing pipe by method other than open cut.